Client
Benina Airport
Location
Benina Airport / Benghazi
information
- INSTALLATION WORK
- ILS/DME Benina Airport
- Installing 2 electrical generator 22KVA with ATS and automatic diesel tank refuelling capacity 3000L
- Extending electrical power cables
- Installing electrical distribution board
- Terminal the power cables and connected it to the electrical generators ,ATS'S and MDB in shelters
- Connecting the electrical wires in shelters (ILS/DME equipment's)
- Installing the ground systems for (localizer and Gb) Air navigation systems
No comment